Thông tin sử dụng

980

980

Tên tài liệu: T&C MOS cho BMS – Phương án kiểm tra và chạy thử BMS chi tiết

Mục lục

        Tài liệu tương tự

        • Bản rút gọn

        • Bản đầy đủ (song ngữ Eng-Viet)

        • Bản đầy đủ (EN)

        • Hướng dẫn sử dụng

        1.INTRODUCTION

         

        This Method Statement outlines the methodology and procedures to be followed for Commissioning Level 3 (CxL3) testing, specifically the "Point to Graphic" verifying of the Building Management System (BMS). The purpose of this Level 3 procedure is to ensure that all I/O points connected to the DDC (Direct Digital Controller) are correctly mapped and displayed on the BMS graphical interface in accordance with the approved point list and system design

        The accuracy of point mapping is a fundamental requirement in any BMS commissioning process. It forms the basis for functional verification, operational monitoring, and long-term system reliability. This document describes the roles of involved parties, test procedures, acceptance criteria, and risk assessment

        Updating

        Giá: 
        39.000đ
        Tiếp tục mua hàng

        1.    INTRODUCTION    

        2.    SCOPE OF WORK    

        3.    ROLES AND RESPONSIBILITIES 

        4.    TOOLS AND INSTRUMENTS    

        5.    RISK ASSETMENT

        6.    METHODOLOGY  

        7.    ACCEPTANCE CRITERIA

        8.    CHECKLIST TEMPLATE    

        9.    ATTACHMENTS    
         

        Giá: 
        39.000đ
        Tiếp tục mua hàng
        Hotline
        0
        Zalo